China Rail For Nepal Came Before 3 Days As Assumed

เคญिเคกिเคฏो เคธเคนिเคค เคนेเคฐ्เคจुเคนोเคธ !
Advertisement
The length of the railway is 1,956 km (1,215 mi). Construction of the 815 km (506 mi) section between Xining and Golmud was completed by 1984. The 1,142 km (710 mi) section between Golmud and Lhasa was inaugurated on July 1, 2006, by Chinese President Hu Jintao: the first two passenger trains were "Qing 1" (Q1) from Xining to Golmud, and "Zang 2" (J2) from Golmud to Lhasa.[1] This railway is the first to connect the Tibet Autonomous Region to any other province, which, due to its elevation and terrain, is the last province-level entity in mainland China to have a railway. Testing of the line and equipment started on 1 May 2006. Passenger trains run from Beijing, Chengdu, Chongqing, Guangzhou, Shanghai, Xining, and Lanzhou.


เคญिเคกिเคฏो เคธเคนिเคค เคนेเคฐ्เคจुเคนोเคธ !
Advertisement

SHARE THIS

Author:

Previous Post
Next Post